Skip to main content

This is a new service – your feedback will help us to improve it.

Hart District Council

Brownfield land

Reference Name Organisation Site address Point Site plan URL Hectares Ownership status Planning permission status Planning permission type Planning permission date Planning permission history Deliverable Minimum net dwellings Maximum net dwellings Hazardous substances Notes Start date Entry date End date
SHL128 SHL128 Rose Court, Crondall POINT (-0.878243 51.247124) https://www.hart.gov.uk/Evidence-base#SHLAADocs 0.92 not-owned-by-a-public-authority not-permissioned yes 15 Part of SHLAA site SHL128. The eastern part of the whole site is not brownfield land 2017-12-22 2017-12-22 2023-03-29
SHL357 SHL357 Land at Sankey Lane, Fleet POINT (-0.815576 51.294419) https://www.hart.gov.uk/Evidence-base#SHLAADocs 0.89 not-owned-by-a-public-authority not-permissioned yes 20 2017-12-22 2017-12-22 2023-03-29
SHL034 SHL034 Land adjoining Winchfield Court POINT (-0.880288 51.281476) https://www.hart.gov.uk/Evidence-base#SHLAADocs 0.29 not-owned-by-a-public-authority not-permissioned yes 6 Part of SHLAA site SHL034. The southern and northern parts of the whole site are not brownfield land 2017-12-22 2017-12-22 2023-03-29
16/03378/FUL 16/03378/FUL Bartley House, Station Road, Hook, Hampshire, RG27 9JF POINT (-0.96069 51.277317) https://publicaccess.hart.gov.uk/online-applications/ 0.6 not-owned-by-a-public-authority permissioned full-planning-permission 2016-05-31 yes 102 102 Demolition of office building and redevelopment to provide 4 x blocks containing a total of 102 apartments (46 x 1 bed and 56 x 2-bed). Under construction at April 2021 with 40 units completed 2017-12-22 2020-11-06
16/00883/PRIOR 17/02465/FUL 16/00883/PRIOR 17/02465/FUL Providence House, 2 Bartley Way, Hook POINT (-0.917354 51.28749) https://publicaccess.hart.gov.uk/online-applications/ 1.69 not-owned-by-a-public-authority permissioned other 2016-05-24 yes 109 78 dwellings completed at 1 April 2018. Change of use from B1 to C3 2017-12-22 2018-12-20 2023-03-29
17/02762/FUL 17/02762/FUL 144 Clarence Road, Fleet, GU51 3RS POINT (-0.840953 51.279394) https://publicaccess.hart.gov.uk/online-applications/ 0.05 not-owned-by-a-public-authority permissioned full-planning-permission 2017-09-07 yes 5 5 Redevelopment of site to construct building to house 5 2-bedroom residential units. Development complete at April 2019. 2017-12-22 2017-12-22 2019-11-21
17/02008/PRIOR 17/02010/PRIOR 17/02011/PRIOR 17/02008/PRIOR 17/02010/PRIOR 17/02011/PRIOR Victoria House, 18-22 Albert Street, Fleet POINT (-0.837735 51.28366) https://publicaccess.hart.gov.uk/online-applications/ 0.1 not-owned-by-a-public-authority permissioned other 2017-10-05 yes 12 Change of use from B1a offices to 5 flats on ground floor, 5 flats on first floor, and 2 flats on second floor 2017-12-22 2018-12-20 2023-03-29
17/01977/FUL 18/00649/PRIOR 17/01977/FUL 18/00649/PRIOR Lorica House, Lorica Consulting Ltd, Minley Road, Fleet POINT (-0.830002 51.296227) https://publicaccess.hart.gov.uk/online-applications/ 0.32 not-owned-by-a-public-authority permissioned other 2018-02-08 yes 25 Change of use from B1a offices to 17 apartments and create a second floor to provide 8 flats 2017-12-22 2018-12-20 2023-03-29
17/01978/FUL 18/00650/PRIOR 17/01978/FUL 18/00650/PRIOR Infineon House, Fleet Mill, Minley Road, Fleet POINT (-0.830013 51.296919) https://publicaccess.hart.gov.uk/online-applications/ 0.43 not-owned-by-a-public-authority permissioned other 2018-02-09 yes 29 Change of use from B1a office to form 19 apartments and create a second floor to provide 10 flats 2017-12-22 2018-12-20 2023-03-29
17/02118/PRIOR 17/02118/PRIOR Zenith House, 3 Rye Close, Fleet, Hampshire, GU51 2UY POINT (-0.824663 51.298611) https://publicaccess.hart.gov.uk/online-applications/ 0.29 not-owned-by-a-public-authority permissioned other 2017-11-01 23 23 Change of use from B1a offices to 23 dwellings. Scheme has no SANG mitigation and therefore can not be considered deliverable. Site not included in housing trajectory. Site covered by Article 4 Direction removing right to change from B1 to C3 with effect from 2019-05-06. Permission lapses 2020-11-01. 2017-12-22 2018-12-20
17/00525/PRIOR 17/02652/PRIOR 17/00525/PRIOR 17/02652/PRIOR Vantage House, Meridian Office, Osborn Way, Hook POINT (-0.959207 51.278869) https://publicaccess.hart.gov.uk/online-applications/ 0.15 not-owned-by-a-public-authority permissioned other 2017-04-27 17 Scheme has no SANG mitigation and therefore can not be considered deliverable. Site not included in housing trajectory.. Change of use of offices (B1a) to form 15 apartments on first and second floors and 2 apartments on third floor 2017-12-22 2018-12-20 2023-03-29
18/00624/PRIOR 18/00624/PRIOR Building 260-270 Bartley Wood, Bartley Wood Business Park, Bartley Way, Hook POINT (-0.949967 51.278517) https://publicaccess.hart.gov.uk/online-applications/ 2.15 not-owned-by-a-public-authority permissioned other 2018-05-16 116 Scheme has no SANG mitigation and therefore can not be considered deliverable. Site not included in housing trajectory.. Change of use of offices (B1a) to dwellinghouse (C3) 2017-12-22 2018-12-20 2023-03-29
17/00771/FUL 17/00771/FUL Guillemont Park, Minley Road, Blackwater, Camberley, Surrey, GU17 9QG POINT (-0.79307 51.305951) https://publicaccess.hart.gov.uk/online-applications/ 12 not-owned-by-a-public-authority permissioned full-planning-permission 2018-01-15 yes 313 313 Demolition of the existing office buildings and construction of 313 residential dwellings. Also known as Sun Park. Development 17/00771/FUL under construction at April 2021 (274 dwellings completed). Completed at April 2022. 2017-12-22 2022-09-30 2022-09-30
18/00931/PRIOR 18/00931/PRIOR 125-147 Fleet Road, Fleet, Hampshire, GU51 3PD POINT (-0.838514 51.283452) https://publicaccess.hart.gov.uk/online-applications/ 0.59 not-owned-by-a-public-authority permissioned other 2018-10-25 yes 30 30 Change of use of B1 offices to 30 apartments. Scheme has no SANG mitigation and therefore can not be considered deliverable. Site not included in housing trajectory. 2017-12-22 2018-12-20
17/00219/PRIOR 17/00219/PRIOR Europa House, 5 Bartley Wood Business Park, Bartley Way, Hook POINT (-0.955023 51.279398) https://publicaccess.hart.gov.uk/online-applications/ 1.11 not-owned-by-a-public-authority permissioned other 2017-03-23 116 Scheme has no SANG mitigation and therefore can not be considered deliverable. Site not included in housing trajectory.. Change of use of B1 offices to 116 dwellings 2018-12-20 2018-12-20 2023-03-29
17/02484/PRIOR 17/02484/PRIOR Flagship House, Reading Road North, Fleet, Hampshire, GU51 4WD POINT (-0.846838 51.279128) https://publicaccess.hart.gov.uk/online-applications/ 0.49 not-owned-by-a-public-authority not-permissioned other 2017-11-30 no 31 31 Change of use of B1 office to 23 x one and 8 x two bedroom apartments. Scheme has no SANG mitigation. Site not included in housing trajectory. Description corrected in 2019 following a review of the original permission. Prior lapsed in November 2020. This has been removed from the register as it no longer meets the criteria for inclusion. 2018-12-20 2021-12-07 2022-12-22
16/02784/PRIOR 16/02784/PRIOR 110 Fleet Road, Fleet, Hampshire, GU51 4BE POINT (-0.841032 51.282533) https://publicaccess.hart.gov.uk/online-applications/ 0.11 not-owned-by-a-public-authority permissioned other 2016-11-23 15 15 Change of use of office to 15 dwellings. Development complete at April 2019. 2018-12-20 2018-12-20 2019-11-21
16/02083/PRIOR 16/02083/PRIOR Technology House, 1 Fleetwood Park, Barley Way, Fleet, Hampshire, GU51 2QX POINT (-0.831302 51.298686) https://publicaccess.hart.gov.uk/online-applications/ 0.5 not-owned-by-a-public-authority not-permissioned other 2016-10-04 no 43 43 Change of use from B1 offices to 43 apartments. Development under construction April 2020. Development no longer appears on HCC outstanding permissions and is not listed as completed. Previous 'under construction' status considered preemptive in which case permission considered lapsed in October 2019. Subsequent application 19/01009/PRIOR for COU to provide 34 No. apartments finally disposed of. Application (20/03040/FUL) for construction of additional two floors to create 35 new flats (net increase of 26) refused. This has been removed from the register as it no longer meets the criteria for inclusion. 2018-12-20 2021-12-07 2022-12-22
16/01267/PRIOR 16/03332/FUL 16/01267/PRIOR 16/03332/FUL Fleet House, 3 Fleetwood Park, Barley Way, Fleet POINT (-0.830492 51.297814) https://publicaccess.hart.gov.uk/online-applications/ 0.77 not-owned-by-a-public-authority permissioned other 2016-10-14 yes 60 Change of use as office to form 46 apartments and create a second floor to provide 14 flats 2018-12-20 2018-12-20 2023-03-29
16/01704/PRIOR 16/01704/PRIOR Rosebank Parade, Plough Road, Yateley, Hampshire, GU17 7RN POINT (-0.820929 51.341889) https://publicaccess.hart.gov.uk/online-applications/ 0.11 not-owned-by-a-public-authority permissioned other 2016-08-19 11 11 Change of use of 1st floor office to form 11 flats. Scheme has no SANG mitigation and therefore can not be considered deliverable. Site not included in housing trajectory. Permission lapsed 2019-08-19. 2018-12-20 2018-12-20 2019-11-21
17/01912/FUL 17/01912/FUL The Acorn, London Road, Hook POINT (-0.96225 51.283158) https://publicaccess.hart.gov.uk/online-applications/ 0.09 not-owned-by-a-public-authority permissioned full-planning-permission 2018-01-24 yes 5 Conversion of existing commercial property into 5 dwellings 2018-12-20 2018-12-20 2023-03-29
17/01793/FUL 17/01793/FUL Shapley Ranch, London Road, Hartley Wintney, Hook, Hampshire, RG27 8HY POINT (-0.920967 51.291831) https://publicaccess.hart.gov.uk/online-applications/ 0.37 not-owned-by-a-public-authority permissioned full-planning-permission 2018-01-19 yes 7 7 Redevelopment of the site to provide 7 dwellings. Completed as of April 2021 2018-12-20 2021-12-07 2021-04-01
17/00471/OUT 17/00471/OUT Hartland Park, Bramshot Lane, Fleet, Hampshire POINT (-0.807055 51.283946) https://publicaccess.hart.gov.uk/online-applications/ 56 not-owned-by-a-public-authority permissioned outline-planning-permission 2018-07-13 yes 1500 1500 yes Allocated site in Hart Local Plan 2032. Outline PP for up to 1,500 dwellings, local centre, comercial space and school. Full PP for 181 dwellings as part of this. Permission extant with 181 dwellings (phase 1) under construction at April 2020. Reserved matters application 20/01885/REM for phase 2 (132 dwellings) granted November 2020. Reserved matters application 21/02871/REM for phase 3 (331 dwellings) granted. 245 dwellings completed as of April 2024 2017-12-22 2024-11-14
17/02501/FUL 17/02501/FUL Queens Arms, Farnham Road POINT (-0.833672 51.237508) https://publicaccess.hart.gov.uk/online-applications/ 0.26 not-owned-by-a-public-authority permissioned full-planning-permission 2018-04-27 yes 9 Conversion of extended building to provide 9 No residential units - change of use from Use Class B1 to Use Class C3 2018-12-20 2018-12-20 2023-03-29
17/02492/FUL 17/02492/FUL The Oakmede And The Millmede, Minley Road, Fleet, Hampshire, GU51 2RB POINT (-0.829103 51.294571) https://publicaccess.hart.gov.uk/online-applications/ 0.25 not-owned-by-a-public-authority permissioned full-planning-permission 2018-06-27 yes 13 13 Demolition of The Oakmede and outbuildings and the construction of two blocks of 7 flats each. Development completed as of April 2021. 2018-12-20 2021-12-07 2021-04-01
SHL038 18/00110/FUL SHL038 18/00110/FUL Rawlings, Hook POINT (-0.961059 51.278768) https://publicaccess.hart.gov.uk/online-applications/ 1.13 not-owned-by-a-public-authority pending-decision yes 56 37 retirement living apartments for older persons and 19 residential units 2017-12-22 2018-12-20 2023-03-29
SHL041 18/02285/FUL SHL041 18/02285/FUL Imac Systems, Fleet POINT (-0.841537 51.279561) https://www.hart.gov.uk/Evidence-base#SHLAADocs 0.05 not-owned-by-a-public-authority pending-decision yes 6 8 units 2017-12-22 2018-12-20 2023-03-29
SHL192 18/02321/FUL SHL192 18/02321/FUL 140-150 Fleet Road, Fleet POINT (-0.842446 51.282178) https://www.hart.gov.uk/Evidence-base#SHLAADocs 0.21 not-owned-by-a-public-authority pending-decision yes 12 14 flats 2017-12-22 2018-12-20 2023-03-29
SHL047 SHL047 Gefferys House, London Road, Hook, Hampshire, RG27 9EF POINT (-0.954733 51.28489) https://www.hart.gov.uk/Evidence-base#SHLAADocs 1.87 not-owned-by-a-public-authority not-permissioned no 30 65 Originally a SHLAA site. A pre-app was submitted in October 2022 to discuss the re-development of the site for approximately 60 dwellings. This was followed by a planning application for 46 dwellings (23/00578/FUL) that was subsequently withdrawn in November 2023. 2018-12-20 2023-12-06
14/01093/OUT 14/01093/OUT Winkworth Business Park, London Road, Hartley Wintney, Hook, Hampshire, RG27 8HY POINT (-0.92314 51.292094) https://publicaccess.hart.gov.uk/online-applications/ 0.5 not-owned-by-a-public-authority permissioned reserved-matters-approval 2016-01-08 8 8 Reserved Matters 15/02201/REM granted for erection of 5 dwellings. Additional application 16/02141/REM granted for another 3 dwellings. All completed in 2017-18 2017-12-22 2017-12-22 2018-12-20
17/02465/FUL 17/02465/FUL Providence House, 2 Bartley Wood Business Park, Bartley Way, Hook, Hampshire, RG27 9XA POINT (-0.917354 51.28749) https://publicaccess.hart.gov.uk/online-applications/ 1.69 not-owned-by-a-public-authority permissioned full-planning-permission 2017-12-19 yes 107 109 Construction of two additional one bedroom flats within Providence House. Previous approval 16/00883/PRIOR for Change of use from B1 to C3 (107 dwgs) granted 2016-05-24. 107 dwgs complete at April 2024 with the additional 2 under construction. 2017-12-22 2024-11-26
14/00106/MAJOR 14/00106/MAJOR Land Rear Of, 102-108 Fleet Road, Fleet, Hampshire, GU51 4PA POINT (-0.840724 51.2828) https://publicaccess.hart.gov.uk/online-applications/ 0.09 not-owned-by-a-public-authority permissioned reserved-matters-approval 2015-07-01 12 12 Reserved matters 15/00276/REM granted for demolition of existing storage buildings and erection of a single block containing 10 x 1-bed & 2 x 2-bed residential flats. Development complete at April 2019. 2017-12-22 2017-12-22 2019-11-20
17/02311/PRIOR 17/02311/PRIOR Branksome Chambers, Branksomewood Road, Fleet, Hampshire, GU51 4JS POINT (-0.843116 51.281214) https://publicaccess.hart.gov.uk/online-applications/ 0.08 not-owned-by-a-public-authority permissioned other 2017-12-01 5 5 Change of use from office under Class B1(a) to dwelling under Class C3: 5 x 2-bed flats. Previous permission (14/02454/PNDW) for 5 dwellings granted 2014-12-03. Development 17/02311/PRIOR complete at April 2019. 2017-12-22 2019-11-21 2019-11-21
17/02011/PRIOR 17/02011/PRIOR Victoria House, 18-22 Albert Street, Fleet, Hampshire, GU51 3RJ POINT (-0.837735 51.28366) https://publicaccess.hart.gov.uk/online-applications/ 0.1 not-owned-by-a-public-authority permissioned other 2017-10-05 12 12 Change of use from B1a offices to 5 flats on ground floor (17/02008/PRIOR), 5 flats on first floor (17/02010/PRIOR), and 2 flats on second floor (17/02011/PRIOR) all granted the same day. Development complete at April 2019. 2017-12-22 2018-12-20 2019-11-21
18/00649/PRIOR 18/00649/PRIOR Lorica Consulting Ltd, Lorica House, Fleet Mill, Minley Road, Fleet, Hampshire, GU51 2RD POINT (-0.830002 51.296227) https://publicaccess.hart.gov.uk/online-applications/ 0.32 not-owned-by-a-public-authority permissioned other 2018-05-10 yes 25 25 Change of use from B1a offices to 17 apartments. Previous approval 17/00477/PRIOR (18 apartments) granted 2017-04-26. Also permission 17/01977/FUL to create a second floor to provide 8 flats, granted 2018-02-08. Development (18/00649/PRIOR and 17/01977/FUL) completed at April 2021. 2017-12-22 2020-11-06 2021-04-01
18/00650/PRIOR 18/00650/PRIOR Infineon House, Fleet Mill, Minley Road, Fleet, Hampshire, GU51 2RD POINT (-0.830013 51.296919) https://publicaccess.hart.gov.uk/online-applications/ 0.43 not-owned-by-a-public-authority permissioned other 2020-10-23 yes 29 35 Change of use from B1a offices to 19 apartments. Previous approval 17/00475/PRIOR (20 apartments) granted 2017-04-26. Also permission 17/01978/FUL to create a second floor to provide 10 flats, granted 2018-02-09. Development (18/00650/PRIOR and 17/01978/FUL) completed as of April 2021. New application (20/00757/FUL) for erection of two storey building to contain 6 x 1 bed flats on area of hard standing and sub station completed at April 2022. 2017-12-22 2022-09-06 2022-09-06
17/02652/PRIOR 17/02652/PRIOR Vantage House, Meridian Office Park, Osborn Way, Hook, Hampshire, RG27 9HY POINT (-0.959207 51.278869) https://publicaccess.hart.gov.uk/online-applications/ 0.15 not-owned-by-a-public-authority permissioned other 2017-12-21 yes 15 17 Change of use of offices (B1a) to form 15 apartments on first and second floors (17/00525/PRIOR granted 2017-04-27) and 2 apartments on third floor (17/02652/PRIOR granted 2017-12-21). Permission has been extended to 2021-05-01 owing to Covid-19. All 15 units completed under 17/02652/PRIOR at December 2022. 2017-12-22 2021-12-07 2022-12-19
18/02748/PRIOR 18/02748/PRIOR Building 260 and 270, Bartley Wood Business Park, Bartley Way, Hook, Hampshire POINT (-0.949967 51.278517) https://publicaccess.hart.gov.uk/online-applications/ 2.15 not-owned-by-a-public-authority permissioned other 2019-01-31 no 116 122 Change of use of offices (B1a) to dwellinghouse (C3) (122 dwgs). Previous approval (18/00624/PRIOR) for Change of use from B1a to C3 (116 dwgs) granted 2018-05-16. Scheme has no SANG mitigation and therefore can not be considered deliverable. Site not included in housing trajectory. Site covered by Article 4 Direction removing right to change from B1 to C3 with effect from 2019-05-06. 18/02748/PRIOR now considered lapsed. New application 21/01800/FUL for redevelopment to industrial units granted subject to conditions in July 2022. 2017-12-22 2022-09-07 2022-12-22
19/00493/PRIOR 19/00493/PRIOR Europa House, 5 Bartley Wood Business Park, Bartley Way, Hook, Hampshire, RG27 9UF POINT (-0.955023 51.279398) https://publicaccess.hart.gov.uk/online-applications/ 1.11 not-owned-by-a-public-authority not-permissioned other 2019-04-30 no 77 116 Change of use of B1 offices to 116 dwellings. Previous approvals: 16/02737/PRIOR for Change of use of B1 office to 77 C3 dwellings granted 2016-12-05; 16/03054/PRIOR for Change of use of B1 office to 77 C3 dwellings granted 2016-12-30; 17/00219/PRIOR for Change of Use from offices (B1a use) to residential (C3 use) to form 114 flats granted 2019-04-30. Site formerly covered by Article 4 Direction removing right to change from B1 to C3 with effect from 2019-05-06 to 2022-07-01. 19/00493/PRIOR considered lapsed 2022-04-30. New prior application for 114 flats refused in May 2021 (21/00914/PRIOR). Lapsed April 2023 2018-12-20 2023-12-13 2023-12-13
16/03332/FUL 16/03332/FUL Microgen Management Services Ltd, Fleet House, 3 Fleetwood Park, Barley Way, Fleet, Hampshire, GU51 2QT POINT (-0.830492 51.297814) https://publicaccess.hart.gov.uk/online-applications/ 0.77 not-owned-by-a-public-authority permissioned other 2018-02-09 yes 60 60 Change of use of office to form 46 apartments (16/01267/PRIOR granted 2016-10-14) and create a second floor to provide 14 flats (16/03332/FUL granted 2018-02-09. 39 dwellings completed under (16/01267/PRIOR) and 7 completed under (16/03332/FUL) at April 2021. 4 units started but not completed at April 2023. Completed before 1st April 24 2018-12-20 2024-11-14 2024-11-14
19/00101/FUL 19/00101/FUL The Acorn, London Road, Hook, Hampshire, RG27 9DY POINT (-0.96225 51.283158) https://publicaccess.hart.gov.uk/online-applications/ 0.09 not-owned-by-a-public-authority permissioned full-planning-permission 2019-03-15 yes 5 7 Change of Use of the existing commercial property (Use Class A2) into five 1 bed and two 2 bed flats (Use Class C3). Previous permission for conversion into 5 dwellings granted 2018-01-24. Site completed at April 2021. 2018-12-20 2021-12-06 2021-04-01
19/01376/FUL 19/01376/FUL Queens Arms, Farnham Road, Ewshot, Farnham, GU10 5AU POINT (-0.833672 51.237508) https://publicaccess.hart.gov.uk/online-applications/ 0.27 not-owned-by-a-public-authority permissioned full-planning-permission 2019-08-14 yes 9 9 Conversion and extension of building to form 9 residential units: change of use from B1 to C3. Previous application 17/02501/FUL for 9 units permitted 2018-04-27. 9 dwellings completed at 1 April 2022. 2018-12-20 2022-10-04 2022-10-04
18/00110/FUL 18/00110/FUL Rawlings Building, Station Road, Hook, RG27 9HU POINT (-0.961059 51.278768) https://publicaccess.hart.gov.uk/online-applications/ 1.13 not-owned-by-a-public-authority permissioned full-planning-permission 2019-03-29 yes 118 118 Permission is for 37 retirement living apartments for older persons and 19 residential units, plus 68 C2 extra care units. Under construction at April 2020. New application 21/00030/FUL for 75 sheltered apartments, 36 retirement living apartments and 7 residential units granted permission Feb 2023. 111 units under construction at 1 April 2023. Completed as of 1st April 2024 2017-12-22 2024-11-14 2024-11-14
18/02285/FUL 18/02285/FUL Imac Systems Ltd, Upper Street, Fleet, GU51 3PE POINT (-0.841537 51.279561) https://www.hart.gov.uk/Evidence-base#SHLAADocs 0.05 not-owned-by-a-public-authority pending-decision 6 6 17/02891/PREAPP for 6 dwgs, acceptable in principle. 18/02285/FUL for 8 dwgs refused 2019-03-25. Appeal in progress Dec 19. 2017-12-22 2019-11-14
18/01637/FUL 18/01637/FUL Poundworld Plus, 187 - 191 Fleet Road, Fleet, Hampshire, GU51 3BL POINT (-0.841588 51.282737) https://publicaccess.hart.gov.uk/online-applications/ 0.09 not-owned-by-a-public-authority permissioned full-planning-permission 2018-11-09 yes 10 10 Change of use of first floor to 10 C3 flats. Completed as of April 2021. 2019-12-04 2021-12-07 2021-04-01
17/00340/FUL 17/00340/FUL The Acorns, Rye Common, Odiham, Hook, Hampshire, RG29 1HU POINT (-0.903248 51.247038) https://publicaccess.hart.gov.uk/online-applications/ 0.48 not-owned-by-a-public-authority permissioned full-planning-permission 2017-04-18 yes 2 2 Demolition of office/workshop building and construction of two new dwellings (amendments to 16/01568/FUL). 2019-12-04 2019-12-04
17/02569/PRIOR 17/02569/PRIOR Unit B, Lees Buildings, Alton Road, South Warnborough, Hook, Hampshire, RG29 1RZ POINT (-0.964149 51.223026) https://publicaccess.hart.gov.uk/online-applications/ 0.7 not-owned-by-a-public-authority not-permissioned other 2018-06-19 no 3 3 Change of Use from Premises in Light Industrial Use (Class B1(c)) to Dwellinghouses (Class C3). 3 new dwellings. Considered lapsed as of 1 April 2022. This has been removed from the register as it no longer meets the criteria for inclusion. 2019-12-04 2022-10-04 2022-12-22
18/01754/PRIOR 18/01754/PRIOR Building A, Lees Buildings, Alton Road, South Warnborough, Hook, Hampshire, RG29 1RZ POINT (-0.963974 51.223196) https://publicaccess.hart.gov.uk/online-applications/ 0.41 not-owned-by-a-public-authority not-permissioned other 2018-12-20 no 4 4 Change of Use from Premises in Light Industrial Use (Class B1(c)) to 4 x 2 bedroom Dwellinghouses (Class C3). Considered lapsed as of 1 April 2022. This has been removed from the register as it no longer meets the criteria for inclusion. 2019-12-04 2022-10-04 2022-12-22
18/01755/PRIOR 18/01755/PRIOR Steel Frame Building, Lees Buildings, Alton Road, South Warnborough, Hook, Hampshire, RG29 1RZ POINT (-0.963974 51.223196) https://publicaccess.hart.gov.uk/online-applications/ 0.41 not-owned-by-a-public-authority not-permissioned other 2018-12-20 no 6 6 Change of Use from Premises in Light Industrial Use (Class B1(c)) to 6 x 2 bedroom Dwellinghouses (Class C3).Considered lapsed as of 1 April 2022. This has been removed from the register as it no longer meets the criteria for inclusion. 2019-12-04 2022-10-04 2022-12-22
19/00272/PRIOR 19/00272/PRIOR Regus, Centaur House, Ancells Road, Fleet, Hampshire, GU51 2UJ POINT (-0.820388 51.297039) https://publicaccess.hart.gov.uk/online-applications/ 0.51 not-owned-by-a-public-authority not-permissioned other 2019-03-26 no 38 38 Change of use of offices (class B1(a)) to dwellinghouse (class C3) to create 38 dwellings. Permission considered lapsed at 1 April 2022. This has been removed from the register as it no longer meets the criteria for inclusion. 2019-12-04 2022-10-04 2022-12-22

Showing rows 51 to 100 of 138